Scope: Metro Resources was contracted to remove 'A' Frame structures consisting of 12 x 1mtr x 1mtr x 30mtr box structures. Extensive possession planning was required to ensure structures could be removed utilising 80-tonne and 60-tonne cranes together with Hi-Rail Manitou's. All structures were removed within 12hrs, loaded/secured on flat top wagons and transported to Chullora holding yard.