  • Client:  John Holland
  • Duration: 2013-2015
  • Location: Glenfield to Leppington (NSW)
Scope: MRG were engaged in the construction and delivery of 680 OHW structures foundations. Continuous consultation and programming meetings were integral parts of the planning process to ensure planned target dates were achieved with maximum quality and minimum disruption with other workgroups. In addition, Metro Resources Group teams were required to assist in the delivery and completion of CSR, local route, signal base installation, mandrelling / proofing of all cable routes.

Gallery Title

© Copyright 2022 | Privacy Policy  |  All rights reserved. Powered by iseekplant.com.au

Contact Us

Get a free quote by filling out the online form below or speak with a member of our team now by calling (02) 9773 3700

We promise to deliver…

With costs savings

The highest level of quality assurance

Outstanding site safety and environmental records

Collaborative problem solving and value for money